Latest
Mumbai Kalyan Kasara Third Line Project Advances
- By admin
- . April 20, 2026
A major rail capacity upgrade is underway on Mumbai’s Central corridor, with a third track being developed between Kalyan and
Mumbai Airport Adds Cameras To Strengthen Security Grid
- By admin
- . April 20, 2026
Mumbai’s primary aviation hub has significantly expanded its surveillance infrastructure, with over 150 cameras now operational across terminal zones and
Navi Mumbai Airport Third Runway Study Begins
- By admin
- . April 20, 2026
Planning authorities in the Mumbai Metropolitan Region have initiated a feasibility assessment for expanding runway capacity at Navi Mumbai’s upcoming
Mumbai Weather Update Brings Rain And Heat Warning
- By admin
- . April 20, 2026
A brief spell of pre-monsoon showers is expected across Mumbai and neighbouring Thane, offering only temporary respite from rising summer
Mumbai Pipeline Burst Floods Elphinstone Bridge Area
- By admin
- . April 20, 2026
A water pipeline rupture in central Mumbai disrupted supply and caused sudden flooding near Elphinstone Bridge during scheduled distribution hours,
Maharashtra AI Challan Recovery System Scales Up
- By admin
- . April 20, 2026
Maharashtra’s transport administration is preparing a technology-led overhaul of citizen services and enforcement systems, aiming to ease pressure on Regional
Maharashtra Plans New Strategy For MMR Roads
- By admin
- . April 20, 2026
Authorities in Maharashtra are moving to bring external expertise into transport planning across the Mumbai Metropolitan Region (MMR), with plans
Mumbai Pipeline Leak Disrupts Water Supply
- By admin
- . April 20, 2026
A late-evening pipeline rupture in central Mumbai disrupted water supply in parts of Prabhadevi, exposing the fragility of ageing urban
Bengaluru library reopening boosts cultural spaces
- By admin
- . April 20, 2026
In Bengaluru, the reopening of a refurbished library at Alliance Française marks a renewed focus on cultural infrastructure as an
Bengaluru treated water plans face regulatory gap
- By admin
- . April 20, 2026
In Bengaluru, efforts to scale up the use of treated wastewater are facing delays due to the absence of clear