{"id":4452,"date":"2023-10-07T12:20:08","date_gmt":"2023-10-07T12:20:08","guid":{"rendered":"https:\/\/urbanacres.in\/?p=4452"},"modified":"2023-10-07T12:20:08","modified_gmt":"2023-10-07T12:20:08","slug":"first-steel-bridge-ready-on-mumbai-ahmedabad-bullet-train-project","status":"publish","type":"post","link":"https:\/\/livzzy.in\/?p=4452","title":{"rendered":"First Steel Bridge Ready on Mumbai-Ahmedabad Bullet Train Project"},"content":{"rendered":"<p>In a milestone for the Mumbai-Ahmedabad High-Speed Rail project, the National High-Speed Rail Corporation (NHSRC) successfully erected the first steel bridge. This development took place near Kamrej Toll Plaza on NH53 in Surat, marking a remarkable engineering feat in India&#8217;s bullet train project.<br \/>\nThe newly erected steel bridge stands at an impressive 70 meters in length, with a height ranging from 12 to 14 meters. What makes this accomplishment even more remarkable is the sheer weight of the bridge, totalling a massive 673 metric tonne, divided into 700 individual pieces.<br \/>\nThe project aims to construct a total of 28 such steel bridges, with a combined weight of approximately 70,000 metric tonne. These bridges will vary in size from 60 meters in &#8216;simply supported&#8217; spans to larger spans of 130+100 meters. Out of the 28 bridges, 17 will be installed in Gujarat, while the remaining 11 in Maharashtra.<br \/>\nSteel bridges are a particularly suitable choice for crossing highways, expressways and railway lines. Unlike pre-stressed concrete bridges, which typically span 40 to 45 meters and are suitable for various applications, steel bridges offer unique advantages. India has a proven expertise in fabricating steel bridges capable of supporting heavy-haul and semi-high-speed trains, running at speeds between 100 and 160 km\/h.<br \/>\nThe bridge&#8217;s construction journey is equally remarkable. It was manufactured in a workshop located in Hapur district near Delhi, a distance of 1,200 km from the installation site. Stringent quality control measures were in place throughout the production process.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In a milestone for the Mumbai-Ahmedabad High-Speed Rail project, the National High-Speed Rail Corporation (NHSRC) successfully erected the first steel bridge. This development took place<\/p>\n","protected":false},"author":1,"featured_media":4453,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[428,149,152,156,147,181,183,172],"tags":[],"class_list":["post-4452","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ahmedabad","category-infrastructure","category-mmr","category-mobility","category-news","category-rail-ways","category-railways-urban-mobility","category-transportation"],"_links":{"self":[{"href":"https:\/\/livzzy.in\/index.php?rest_route=\/wp\/v2\/posts\/4452","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/livzzy.in\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/livzzy.in\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/livzzy.in\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/livzzy.in\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4452"}],"version-history":[{"count":0,"href":"https:\/\/livzzy.in\/index.php?rest_route=\/wp\/v2\/posts\/4452\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/livzzy.in\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/livzzy.in\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4452"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/livzzy.in\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4452"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/livzzy.in\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4452"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}