{"id":4861,"date":"2023-08-14T10:17:05","date_gmt":"2023-08-14T10:17:05","guid":{"rendered":"https:\/\/urbanacres.in\/?p=4861"},"modified":"2023-08-14T10:17:05","modified_gmt":"2023-08-14T10:17:05","slug":"kochi-metro-phase-2-construction-likely-to-begin-soon","status":"publish","type":"post","link":"https:\/\/livzzy.in\/?p=4861","title":{"rendered":"Kochi Metro Phase-2 Construction Likely to Begin Soon"},"content":{"rendered":"<p>Kochi Metro\u2019s second phase, from JLN Stadium to Infopark-Kakkanad, will be<br \/>\nknown as \u2018Pink Line\u2019 and involve only digital tickets. Work on the 11.3-km-long<br \/>\nelevated line, with a total of 11 stations, is likely to begin by the end of this year.<br \/>\nThe commissioning of the Pink Line is expected by December 2025. The Pink<br \/>\nLine will have only digital tickets. The move is to promote paperless ticketing.<br \/>\nThe name Pink Line will emphasise the safety of women passengers working at<br \/>\nInfopark who often have to walk several kilometres or rely on cabs, especially<br \/>\nduring night time.<\/p>\n<p>Unlike Phase-1, precast method will be adopted in the construction of stations to<br \/>\nspeed up the civil construction work in the second phase. Approximately, six<br \/>\nhectares of precast yard have been identified at HMT Kalamasery.<\/p>\n<p>The stations on the stretch are: JLN Stadium (new station box); Palarivattom<br \/>\nJunction; Palarivattom Bypass; Chembumukku; Vazhakkala; Padamughal;<br \/>\nKakkanad Junction; Cochin Sez; Chittethukara; Kinfra (formerly Rajagiri);<\/p>\n<p>InfoPark -1\/Smart City-1; and InfoPark-2 \/ Smart City-2. Of the 11 stations, four<br \/>\nwill have direct entry to the platform from ground level, avoiding the concourse<br \/>\nfloor. This is to reduce the access time.<\/p>\n<p>Phase-2 will have two special spans &#8212; steel truss of more than 60m each (similar to<br \/>\nthe one constructed between Milma and Tripunithura in Phase-1).\u00a0In Phase-2, one<br \/>\nwill be at the Palarivattom bypass crossing, and the other at the existing Phase-1<br \/>\ncrossing at St Martin Church, Palarivattom.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kochi Metro\u2019s second phase, from JLN Stadium to Infopark-Kakkanad, will be known as \u2018Pink Line\u2019 and involve only digital tickets. Work on the 11.3-km-long elevated<\/p>\n","protected":false},"author":1,"featured_media":4863,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[149,310],"tags":[],"class_list":["post-4861","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-infrastructure","category-metro-ways"],"_links":{"self":[{"href":"https:\/\/livzzy.in\/index.php?rest_route=\/wp\/v2\/posts\/4861","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/livzzy.in\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/livzzy.in\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/livzzy.in\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/livzzy.in\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4861"}],"version-history":[{"count":0,"href":"https:\/\/livzzy.in\/index.php?rest_route=\/wp\/v2\/posts\/4861\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/livzzy.in\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/livzzy.in\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4861"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/livzzy.in\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4861"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/livzzy.in\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4861"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}