{"id":56781,"date":"2025-06-19T14:55:55","date_gmt":"2025-06-19T09:25:55","guid":{"rendered":"https:\/\/urbanacres.in\/?p=56781"},"modified":"2025-06-19T14:55:55","modified_gmt":"2025-06-19T09:25:55","slug":"srinagar-government-buildings-to-get-rooftop-solar-under-rs-100-cr-tender","status":"publish","type":"post","link":"https:\/\/livzzy.in\/?p=56781","title":{"rendered":"Srinagar government buildings to get rooftop solar under Rs 100\u2011cr tender"},"content":{"rendered":"<h3><strong>NHPC REL has issued a \u20b9100\u2011crore tender to install 23.33\u202fMW of rooftop solar across 279 government buildings in Jammu and Kashmir, boosting clean\u2011energy self\u2011reliance under the RESCO model. NHPC Renewable Energy Limited (NHPC REL) has launched a significant rooftop solar tender\u2014valued at approximately \u20b9100\u202fcrore\u2014to harness 23.33\u202fMW of solar power on 279 public buildings across Jammu and Kashmir.<\/strong><\/h3>\n<h4>Managed by the Jammu &amp; Kashmir Energy Development Agency (JAKEDA), the project targets departments including law, irrigation, environment and home affairs, under a RESCO model aimed at enhancing energy autonomy. The tender mandates that installations be operational within nine months of award, with technical bids due by 16 July 2025 and opening on 21 July. Bids are grouped into eight categories, reflecting building size and roof suitability. Fees range from \u20b91,000 to \u20b95,000 per category, with earnest money deposits varying proportionately and performance security set at \u20b92,475\u202fper\u202fkW.<\/h4>\n<h4>Eligibility criteria require prior experience in solar project delivery\u2014either through at least 400\u202fkW of completed rooftop systems, including one \u2265\u202f40\u202fkW, or as EPC contractors in relevant fields with contracts worth \u20b94\u202fcrore or more. Firms must have constructed at least one 11\u202fkV substation, and meet annual turnover benchmarks ranging from \u20b971\u202flakh for smaller clusters to \u20b913.6\u202fcrore for larger ones, alongside positive net worth in the past two financial years. This project follows NHPC\u2019s earlier tenders: 39.73\u202fMW for rooftop solar in Sikkim and Jammu &amp; Kashmir, and JAKEDA\u2019s own 175\u202fMW empanelment plan for UT buildings, underscoring sustained renewable momentum.<\/h4>\n<h4>The tender is a strategic component of India\u2019s broader decarbonisation vision. Rooftop solar on public infrastructure offers multiple benefits: reducing carbon emissions, cutting energy costs, and advancing gender-neutral, community-resilient services in line with eco-city goals. Long-term O&amp;M provision (25 years under RESCO) ensures both performance assurance and green job creation . Resilience is central to the model. By generating renewable power on-site, government offices can mitigate risks from unreliable grid supply\u2014especially pertinent in off-grid and remote areas of Jammu &amp; Kashmir, which have experienced long power outages . Additionally, onsite solar installations contribute to decentralised energy infrastructure, reducing transmission losses and bolstering energy equity.<\/h4>\n<h4>Challenges lie ahead. Successful execution demands coordination across multiple departments, adherence to technical standards, and timely commissioning within nine months. Quality control, module life-cycles and net metering agreements will also be critical to sustaining performance and delivering on financial forecasts. Furthermore, ensuring equitable deployment across urban and rural offices is vital. Smaller institutions may require capacity building to engage in tender processes and interface with developers. Women-led local enterprises could be incentivised through differential bid scoring to meet gender\u2011inclusive service objectives.<\/h4>\n<h4>This tender sits within a rapidly expanding rooftop solar ecosystem. As of March 2025, over 2,489 rooftop systems\u2014total capacity 10.38\u202fMW\u2014had been operational in Jammu &amp; Kashmir under federal schemes, with 35\u202fMW added via NHPC\u2019s initiatives. The upcoming 23.33\u202fMW rollout thus marks a significant addition to the region\u2019s clean\u2011energy portfolio. The long-term payoff is clear: cleaner public buildings, lower energy costs, and progress towards India\u2019s net\u2011zero ambitions. For Jammu &amp; Kashmir, the tender also offers water\u2011pump-linked solar potential, ecosystem\u2011adapted agro\u2011forestry, and replicable models for other Union Territories. As bid deadlines near, industry watchers anticipate strong developer interest, particularly among firms with RESCO experience and 11\u202fkV substation delivery capacity. The auction\u2019s success could signal robust investor confidence in Kashmir\u2019s green infrastructure sector.<\/h4>\n<p>ALso Read :<a href=\"http:\/\/KC Heritage Towers to Be Converted into Apartments\">KC Heritage Towers to Be Converted into Apartments<\/a><\/p>\n<h5>Srinagar government buildings to get rooftop solar under Rs 100\u2011cr tender<\/h5>\n","protected":false},"excerpt":{"rendered":"<p>NHPC REL has issued a \u20b9100\u2011crore tender to install 23.33\u202fMW of rooftop solar across 279 government buildings in Jammu and Kashmir, boosting clean\u2011energy self\u2011reliance under<\/p>\n","protected":false},"author":1,"featured_media":56790,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[146,147,148],"tags":[591,33938,75074,75075,75076,711],"class_list":["post-56781","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-latest","category-news","category-urban-news","tag-clean-energy","tag-eco-city","tag-govt-rooftop-solar","tag-jammu-kashmir-solar","tag-resco-tender","tag-sustainable-infrastructure"],"_links":{"self":[{"href":"https:\/\/livzzy.in\/index.php?rest_route=\/wp\/v2\/posts\/56781","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/livzzy.in\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/livzzy.in\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/livzzy.in\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/livzzy.in\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=56781"}],"version-history":[{"count":0,"href":"https:\/\/livzzy.in\/index.php?rest_route=\/wp\/v2\/posts\/56781\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/livzzy.in\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/livzzy.in\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=56781"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/livzzy.in\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=56781"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/livzzy.in\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=56781"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}