{"id":58782,"date":"2025-06-27T16:59:20","date_gmt":"2025-06-27T11:29:20","guid":{"rendered":"https:\/\/urbanacres.in\/?p=58782"},"modified":"2025-06-27T16:59:20","modified_gmt":"2025-06-27T11:29:20","slug":"pune-ring-road-gets-boost-as-rs17000-cr-land-fund-approved","status":"publish","type":"post","link":"https:\/\/livzzy.in\/?p=58782","title":{"rendered":"Pune Ring Road Gets Boost as Rs17000 Cr Land Fund Approved"},"content":{"rendered":"<h3><strong>Pune will see its long-awaited Ring Road project move closer to reality as the Maharashtra government approved the release of \u20b917,000 crore to speed up land acquisition for nine high-priority infrastructure corridors across the state. The decision came after Chief Minister Devendra Fadnavis chaired a high-level meeting with top officials and Maharashtra State Road Development Corporation (MSRDC) representatives in Mumbai.<\/strong><\/h3>\n<h4><span style=\"font-weight: 400;\">The \u20b917,000 crore outlay is part of a broader \u20b936,000 crore package allocated for acquiring land for expressways, multimodal corridors, and key connector roads spanning multiple districts. The Pune Ring Road alone accounts for \u20b99,000 crore of this budget, reflecting the urgency with which the state intends to push forward stalled or delayed mega projects under the MSRDC\u2019s mandate. According to Anilkumar Gaikwad, Managing Director and Vice-Chairman of MSRDC, land acquisition for some projects \u2014 including the Jalna\u2013Nanded expressway and the Pune Ring Road \u2014 is nearly complete. Other corridors, such as the Shaktipeeth expressway, the Virar\u2013Alibaug multimodal expressway, and three critical roadways in Vidarbha, are still in the land measurement and survey phase.<\/span><\/h4>\n<h4><span style=\"font-weight: 400;\">The Shaktipeeth expressway, branded as the \u2018Golden Triangle\u2019, is being planned to connect Goa, Mumbai, and Nagpur \u2014 three pivotal commercial and religious nodes. So far, 86 out of 300 affected villages have completed the initial land measurements, with the remainder expected by August. The expressway is being promoted as a spiritual and economic corridor, aiming to link pilgrimage centres while strengthening east-west connectivity. Chief Minister Fadnavis underscored that land acquisition delays result in cost overruns and implementation fatigue. He directed the Finance Department to immediately release \u20b912,000 crore to keep momentum intact. He also instructed the Forest Department to fast-track clearances, particularly in ecologically sensitive stretches such as the Morbe\u2013Karanja segment of the Virar\u2013Alibaug corridor.<\/span><\/h4>\n<h4><span style=\"font-weight: 400;\">Notably, the Pune Ring Road is seen as a critical urban decongestion project, with the potential to divert long-distance freight and commuter traffic away from the saturated city centre. Once completed, it will serve as a high-capacity arterial route facilitating cross-regional movement, reducing air pollution, and freeing up core urban corridors for local transit. Fadnavis also called for implementation model finalisation immediately after land acquisition \u2014 including frameworks like Build-Operate-Transfer (BOT) or Public-Private Partnership (PPP) to ensure financial viability without delays.<\/span><\/h4>\n<h4><span style=\"font-weight: 400;\">The Virar\u2013Alibaug corridor, pegged at \u20b922,000 crore, is one of the most ambitious multimodal transport initiatives in the region. By linking the Konkan coastline to the Mumbai Metropolitan Region (MMR), it aims to boost economic integration, facilitate cargo movement, and reduce travel time drastically. The Vadhwan\u2013Samruddhi and Navgaon\u2013Morgaon connectors are also being prioritised under this funding round. In Vidarbha, acquisition plans for the Bhandara\u2013Gadchiroli, Nagpur\u2013Chandrapur, and Nagpur\u2013Gondiya corridors have been pushed up the queue. Additionally, the government reviewed critical mineral and logistics corridors such as the Navegaon (Mor)\u2013Surjagad mineral route, which is set to integrate mining supply chains with rail and road networks.<\/span><\/h4>\n<h4><span style=\"font-weight: 400;\">Fadnavis made it clear that land acquisition for these mineral corridors, as well as railway projects such as Wardha\u2013Nanded and Vadsa\u2013Gadchiroli, must begin immediately. \u201cAgencies must work on mission mode,\u201d he said, directing that all departments adhere strictly to timelines. The review also included planned greenfield airports in Kolhapur, Karad, Akola, Gadchiroli, and Chhatrapati Sambhajinagar, with Fadnavis instructing officials to integrate land acquisition seamlessly into MSRDC\u2019s master planning schedule.<\/span><\/h4>\n<h4><span style=\"font-weight: 400;\">Infrastructure analysts have welcomed the funding announcement as a turning point for Maharashtra\u2019s capital and logistics ecosystem, noting that timely land acquisition is often the weakest link in India\u2019s infrastructure pipeline. The CM&#8217;s emphasis on coordination between departments, early clearances, and flexible implementation models signals a state-led push to preempt cost escalations and bureaucratic delays. With projects spanning urban centres, pilgrimage routes, industrial corridors, and tribal districts, the roadmap also reflects a balanced regional development strategy.<\/span><\/h4>\n<h4><span style=\"font-weight: 400;\">If executed to plan, the \u20b917,000 crore land acquisition package could unlock multi-billion-rupee infrastructure investments, boost employment, and improve connectivity for both freight and passengers across Maharashtra.<\/span><\/h4>\n<h4><strong>Also Read: <a href=\"https:\/\/livzzy.in\/bmc-plans-rs-5000-crore-flood-master-plan-for-mumbai\/\">BMC Plans Rs 5000 Crore Flood Master Plan for Mumbai<\/a><\/strong><\/h4>\n<p>Pune Ring Road Gets Boost as Rs17000 Cr Land Fund<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Pune will see its long-awaited Ring Road project move closer to reality as the Maharashtra government approved the release of \u20b917,000 crore to speed up<\/p>\n","protected":false},"author":1,"featured_media":58793,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[146,147,148],"tags":[5771,75572,4283,26639,77382,77383,13454,53714],"class_list":["post-58782","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-latest","category-news","category-urban-news","tag-devendra-fadnavis","tag-jalna-nanded-expressway","tag-maharashtra-infrastructure","tag-msrdc-land-acquisition","tag-multimodal-corridors","tag-ppp-model-roads","tag-pune-ring-road","tag-shaktipeeth-expressway"],"_links":{"self":[{"href":"https:\/\/livzzy.in\/index.php?rest_route=\/wp\/v2\/posts\/58782","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/livzzy.in\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/livzzy.in\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/livzzy.in\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/livzzy.in\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=58782"}],"version-history":[{"count":0,"href":"https:\/\/livzzy.in\/index.php?rest_route=\/wp\/v2\/posts\/58782\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/livzzy.in\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/livzzy.in\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=58782"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/livzzy.in\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=58782"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/livzzy.in\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=58782"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}